Canada Post Corporation (CPC) is working on a new modernized system called Delivery Systems Re-Architecture (DSRA).
Through this new system CPC has currently digitized the RSMC log sheets and Point of Call (POC) maintenance report. This means that information currently captured manually, will now be captured on the Portable Data Terminal (PDT). CPC will be implementing this new process nationally on September 30th, 2019. Log sheets will continue to be provided if requested.
At national consultation, CUPW raised concerns on the ability to verify the accuracy of information captured or inputted into the device. Canada Post provided the following safeguards for verification.